Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
A hybrid risk prioritization approach in construction projects using failure mode and effective analysis
Stockholm University, Faculty of Social Sciences, Stockholm Business School. University of the Chinese Academy of Science, China.
Number of Authors: 22020 (English)In: Engineering Construction and Architectural Management, ISSN 0969-9988, E-ISSN 1365-232X, Vol. 27, no 9, p. 2661-2686Article in journal (Refereed) Published
Abstract [en]

Purpose - Construction projects involve with various risks during all phases of project lifecycle. Failure mode and effective analysis (FMEA) is a useful tool for identifying and eliminating possible risk of failure modes (FMs) and improving the reliability and safety of systems in a broad range of industries. The traditional FMEA method applies risk priority number method (RPN) to calculate risk of FMs. RPN method cannot consider the direct and indirect interdependencies between the FMs and is not appropriate for complex system with numerous components. The purpose of this study is to propose an approach to consider interdependencies between FMs and also using fuzzy theory to consider uncertainties in experts' judgments.

Design/methodology/approach - The proposed approach consist of three stages: the first stage of hybrid model used fuzzy FMEA method to identify the failure mode risks and derive the RPN values. The second stage applied Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL) method to determine the interdependencies between the FMs which are defined through fuzzy FMEA. Then, analytic network process (ANP) is applied in the third stage to calculate the weights of FMs based on the interdependencies that are generated through FDEMATEL method. Finally, weight of FMs through fuzzy FMEA and FDEMATEL-ANP are multiplied to generate the final weights for prioritization. Afterward, a case study for a commercial building project is introduced to illustrate proficiency of model.

Findings - The results showed that the suggested approach could reveal the important FMs and specify the interdependencies between them successfully. Overall, the suggested model can be considered as an efficient hybrid FMEA approach for risk prioritization.

Originality/value - The originality of approach comes from its ability to consider interdependencies between FMs and uncertainties of experts' judgments.

Place, publisher, year, edition, pages
2020. Vol. 27, no 9, p. 2661-2686
Keywords [en]
Risk prioritization, Fuzzy FMEA, FDEMATEL, ANP, Construction projects
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:su:diva-181926DOI: 10.1108/ECAM-10-2019-0535ISI: 000531157700001OAI: oai:DiVA.org:su-181926DiVA, id: diva2:1443260
Available from: 2020-06-18 Created: 2020-06-18 Last updated: 2022-02-26Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full text

Authority records

Wu, Desheng

Search in DiVA

By author/editor
Wu, Desheng
By organisation
Stockholm Business School
In the same journal
Engineering Construction and Architectural Management
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 27 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf