Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Samråd i miljökonsekvensbeskrivningarför projekt: En studie av dess historiska och nuvarandefunktion samt en inblick i hur dessfunktion skulle kunna se ut i framtiden
Stockholm University, Faculty of Science, Department of Physical Geography and Quaternary Geology.
2014 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [sv]

Forskare argumenterar för att det krävs mer deliberativa kvaliteter i dagensdemokratiska Sverige för att vi dels ska kunna kallas oss för en fungerande demokratioch dels för att vi ska ha en chans att kunna nå något vi nästan alla strävar efter idag –hållbar utveckling. En lagstadgad och därmed vanlig metod som används idag för attutreda en planerad verksamhets miljökonsekvenser är att upprätta enmiljökonsekvensbeskrivning (MKB). Samrådsprocessen i MKB:s för projekt är ettmedel att göra processen mer demokratisk. Syftet med denna studie är att utvärderadetta demokratiska medel för att kunna dra slutsatser kring om det fyller sin funktionoch hur det skulle gå att förbättra för att generera fler positiva utfall. Syftet harbesvarats med hjälp av två litteraturstudier, sex djupintervjuer och enenkätundersökning som alla har kopplats till studiens teoretiska utgångspunkter. En delav uppsatsens teori är relevant bakgrund (d.v.s. avsnitt Miljökonsekvensbeskrivningar)medan andra delar är vetenskapliga och har som syfte att jämföras med resultaten (d.v.s.avsnitt Samtalsdemokrati).

Det viktigaste resultatet från de två litteraturstudierna var att kapitlet om MKB imiljöbalken inte har genomgått någon större förändring från det att det skapades tillsidag och att det behövs andra metoder (ex. intervjuer och observationer) för att kunnaavgöra om det som kommer fram på samrådet tas hänsyn till i MKB:n. Det mestframträdande resultatet från intervjuer och enkätundersökning var dels att denvanligaste formen på samråd är antingen skriftligt eller ett stormöte och dels attupplägget på stormöten ofta inleds med att verksamhetsutövaren håller en långpresentation och i slutet blir det en kort frågestund. Resultatet visar också att det verkarvara form och upplägg på samrådsprocessen som skapar de största problemen för att videls ska få ut de kvaliteter som konsulter och verksamhetsutövare själva anser ärviktigast, nämligen synpunkter och dels för att kunna säkra att detta verktyg för att ökademokratin, som samråd just är, inte bara gör det i teorin utan också i praktiken. Det ärkring detta som diskussionen till största del har kretsat och det är detta som äruppsatsens viktigaste slutsats. Resultatet visar också att konsulter ochverksamhetsutövare är medvetna om att de vanligaste formerna för samråd inte äroptimala för att leverera de synpunkter de så gärna vill ha, ändå finns en motvilja till attändra och utveckla formen. Ett förslag för vidare utredning är att gå djupare in på vaddetta beror på för att på sikt kanske finna nyckeln till hur man kan ändra på dennamotvilja att utveckla form och upplägg på samrådsförfarandet.

Abstract [en]

Researchers argue that it takes more deliberative qualities in today's democratic Swedenboth that we should be able to call us for a functioning democracy but also for us tohave a chance to achieve something we almost all endeavors today - sustainabledevelopment. A statutory and thus a common method used today to investigate whatenvironmental impact a planned activity may cause is to establish an EnvironmentalImpact Assessment (EIA). The consultation process in EIA:s for projects is a means tomake the process more democratic. The purpose of this study is to evaluate thisdemocratic means in order to draw conclusions about whether it fulfills its function andwhether it would be possible to improve in order to generate more positive outcomes.The aim has been answered with the help of two literary studies, six in-depth interviewsand a survey which has been linked to the study's theoretical points. Part of the thesis isrelevant background theory (i.e the Environmental Impact Assessments section) whileother parts are scientific and are intended to be compared with the results (i.e thedeliberative democracy section).The most important result from the two literature studies was that the chapter on EIA inthe environmental code has not undergone any major change from the time it wascreated until today and the need for other methods (e.g. interviews and observations) todetermine whether the comments during the consultation will be considered in the EIA.

The most striking result from the interviews and survey were that the most commonform of consultation is either writing or a public meeting and partly that the layup atlarge meetings often begin with the operator holding a long presentation and in the endit will be a short question and answer session. The result also shows that it seems to bethe form and structure of the consultation process that creates the biggest problems forus both to get out the qualities that consultants and operators themselves consider mostimportant, namely observations, and partly to ensure that this tool can enhancedemocracy, which consultation is about, not just in theory but also in practice. It is onthis that the discussion mainly revolved around, and it is this that is the essay's mainconclusion. The result also shows that consultants and operators are aware that the mostcommon forms of consultation are not optimal to deliver the comments they want sobadly, yet there is a reluctance to change and develop shape of the consultation process.A proposal for further investigation is to go deeper into what causes this to be able toeventually find the key to how to change this reluctance to develop the form andstructure of the consultation process.

Place, publisher, year, edition, pages
2014. , 62 p.
Keyword [en]
Environmental impact assessment, public consultation, democracy
Keyword [sv]
Miljökonsekvensbeskrivningar, samråd, demokrati
National Category
Environmental Sciences
Identifiers
URN: urn:nbn:se:su:diva-108454OAI: oai:DiVA.org:su-108454DiVA: diva2:758567
Supervisors
Examiners
Available from: 2014-11-21 Created: 2014-10-27 Last updated: 2014-11-21Bibliographically approved

Open Access in DiVA

fulltext(1810 kB)127 downloads
File information
File name FULLTEXT01.pdfFile size 1810 kBChecksum SHA-512
17ce1fc60bb75afe904b3e8373187f72f2ec62daac84d5d6b9e98bcbeb67ebebf16cd62ce562ac740e2072bd8699c5a30ebfdbf33911c524fec6c0fd93fb379d
Type fulltextMimetype application/pdf

By organisation
Department of Physical Geography and Quaternary Geology
Environmental Sciences

Search outside of DiVA

GoogleGoogle Scholar
Total: 127 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 158 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf