Change search
ReferencesLink to record
Permanent link

Direct link
Single-period inventory model for one-level assembly system with stochastic lead times and demand
Stockholm University, Faculty of Social Sciences, Stockholm Business School. University of Chinese Academy of Sciences, China.
Number of Authors: 3
2016 (English)In: International Journal of Production Research, ISSN 0020-7543, E-ISSN 1366-588X, Vol. 54, no 1, 186-203 p.Article in journal (Refereed) Published
Abstract [en]

Replenishment planning of an assembly system with one type of finished product assembled from diverse external suppliers to satisfy finished product demand. It is supposed that the component lead times and finished product demand are random discrete variables. The assembly company must determine what are the best quantities of components and when is the right time to order. The objective is to minimise the total cost which is composed of holding component costs, tardiness penalties, lost sales and surplus item costs for finished products. A single-period analytical model is proposed. Several properties of the objective function are proven. They are used to develop a Branch and Bound algorithm. Numerical tests for the algorithm are presented. Five heuristics based on Newsvendor model for lead time and demand are proposed and compared with the Branch and Bound algorithm. These tests show that the suggested Branch and Bound algorithm can solve large size problems within a short time. The proposed heuristics but one are not competitive with the Branch and Bound algorithm. The truncated version of Branch and Bound gives better results. The model suggested is better adapted to actual contract assembler environments, more realistic and can better approximate real-life industrial situations. The proposed exact algorithm provides optimal solutions for all discrete distributions of probabilities of lead times and demand. A new general approach to design such discrete optimisation algorithms is presented.

Place, publisher, year, edition, pages
2016. Vol. 54, no 1, 186-203 p.
Keyword [en]
assembly contract, random demand, random lead times, replenishment planning, newsvendor model, Branch and Bound, heuristics
National Category
Other Engineering and Technologies Economics and Business
Identifiers
URN: urn:nbn:se:su:diva-126757DOI: 10.1080/00207543.2015.1066518ISI: 000368039100012OAI: oai:DiVA.org:su-126757DiVA: diva2:944776
Available from: 2016-06-30 Created: 2016-02-15 Last updated: 2016-06-30Bibliographically approved

Open Access in DiVA

No full text

Other links

Publisher's full text

Search in DiVA

By author/editor
Wu, Desheng Dash
By organisation
Stockholm Business School
In the same journal
International Journal of Production Research
Other Engineering and TechnologiesEconomics and Business

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Altmetric score

Total: 6 hits
ReferencesLink to record
Permanent link

Direct link